Affichage de 184 résultats

Department of Management (DM) (1997-present) Avec documents numériques
Aperçu avant impression Affichage :
Glass negative
Glass negative
Glass negative
Glass negative
This work was summarized by the Secretary-General and prepared for the General Assembly in this preliminary report of 1 July 1947.
This work was summarized by the Secretary-General and prepared for the General Assembly in this preliminary report of 1 July 1947.
Sketches
Sketches
Sketches
Sketches
Clay model
Clay model
Technical analyses of the site were undertaken. Borings were made to determine geological subsurface conditions...
Technical analyses of the site were undertaken. Borings were made to determine geological subsurface conditions...
At the same time, the plans have been continually refined, engineering studies precised, and the design has been advanced. A revised and reduced scheme has resulted...
At the same time, the plans have been continually refined, engineering studies precised, and the design has been advanced. A revised and reduced scheme has resulted...
Site Plan
Site Plan
General Assembly hall plan
General Assembly hall plan
Résultats 161 à 170 sur 184