Showing 1967 results

Department of Management (DM) (1997-present)
Print preview View:

184 results with digital objects Show results with digital objects

At the same time, the plans have been continually refined, engineering studies precised, and the design has been advanced. A revised and reduced scheme has resulted...
At the same time, the plans have been continually refined, engineering studies precised, and the design has been advanced. A revised and reduced scheme has resulted...
Site Plan
Site Plan
General Assembly hall plan
General Assembly hall plan
Conference Rooms and Delegates' Lounge plan
Conference Rooms and Delegates' Lounge plan
Advisory Committee meeting
Advisory Committee meeting
Borings
Borings
Borings
Borings
Proposed system for distribution of communications
Proposed system for distribution of communications
Traffic to the Site
Traffic to the Site
Technical analyses of the site were undertaken. Borings were made to determine geological subsurface conditions...
Technical analyses of the site were undertaken. Borings were made to determine geological subsurface conditions...
Results 181 to 190 of 1967