Aperçu avant impression Fermer

Affichage de 1434 résultats

United Nations Relief and Rehabilitation Administration (UNRRA) (1943-1946) Image Avec objets numériques
Aperçu avant impression Affichage :
Oliver J Todd, UNRRA chief advisory engineer of the giant Yellow River Project, operates a pneuma...
Oliver J Todd, UNRRA chief advisory engineer of the giant Yellow River Project, operates a pneumatic drill at the Lu Wang Fen limestone quarry, 55 miles from the main break in the Yellow River's south dyke near Chengchow, China
Aerial view of Yellow River Project showing in left foreground the completed earthen dam, 3387 fe...
Aerial view of Yellow River Project showing in left foreground the completed earthen dam, 3387 feet long, 200 feet wide at base, 65 feet wide at the top
Honeycombed plain at the Yellow River Project from which thousands of tons of earth have been rem...
Honeycombed plain at the Yellow River Project from which thousands of tons of earth have been removed to build the broad, clay-fill earthen dam is shown at picture's left, with remaining gap to be bridged by a modern rock-fill, timber trestle dam
The Yellow River Project, 1946
The Yellow River Project, 1946
Oliver J Todd, UNRRA Chief Advisory Engineer for the Yellow River Project, supervises the loading...
Oliver J Todd, UNRRA Chief Advisory Engineer for the Yellow River Project, supervises the loading of a giant pile driver which will sink sixty foot piles in the river's bed at the mile-long main break in the dykes at Chengchow
C Togo Sturdivant, left, UNRRA farm machinery specialist, and YC Yuen (in cap), tractor specialis...
C Togo Sturdivant, left, UNRRA farm machinery specialist, and YC Yuen (in cap), tractor specialist of the Ministry of Agriculture and Forestry, check the cargo manifest as a Massey-Harris, Model 82, farm tractor is loaded on a lighter at Point Island
Huge slabs of steel plate to be turned into tools for China's farmers are unloaded by cranes oper...
Huge slabs of steel plate to be turned into tools for China's farmers are unloaded by cranes operated by Chinese crews trained at the Shanghai Central [Shop] of the China-wide MOAF-UNRRA farm tool manufacturing program, designed to
Chinese student-workmen at the Shanghai Central Shop of UNRRA's China-wide farm tool manufacturin...
Chinese student-workmen at the Shanghai Central Shop of UNRRA's China-wide farm tool manufacturing program, scheduled to produce 20,000,000 farm tools per year, finishing the V-slot in die block fogging [ie forging] hammer
CNRRA / 714 An AMOMO-trained Chinese tractor operator drives an UNRRA-supplied Allis Chalmers far...
CNRRA / 714 An AMOMO-trained Chinese tractor operator drives an UNRRA-supplied Allis Chalmers farm tractor skillfully at the agricultural experimental farm of the CNRRA-MOAF office of Agricultural Machinery Operation & Management, at Point Island
This well ventilated modern brick barn at the Northeast Agricultural College in Mukden provides i...
This well ventilated modern brick barn at the Northeast Agricultural College in Mukden provides individual stalls for a herd of 20 cows and 2 bulls supplied to the college by UNRRA from 2,596 brought to China
Résultats 1 à 10 sur 1434